by BlueEnergy Build | Feb 18, 2026
The scope of work includes conducting a comprehensive hydrological investigation at the HGU site through utility mapping (GPR Survay), Geophysical Survey, and water-quality testing followed by detailed data processing, interpretation, and preparation of an integrated...
by BlueEnergy Build | Feb 18, 2026
The scope of work includes conducting a comprehensive geophysical investigation along a upcoming 1.94 km tunnel portion by performing remote sensing mapping of the surface, geological assessment of structural controls, and subsurface geophysical surveys using EM and...
by BlueEnergy Build | Feb 18, 2026
The scope of work includes conducting a comprehensive hydro-geological and geophysical investigation over the designated 106-acre area by performing mag-netic, resistivity soundings, and detailed water-level and water-quality assessments. The study aims to evaluate...
by BlueEnergy Build | Feb 18, 2026
The scope of work involves conducting detalled resis tivity profiling, VES, and ERT to identify concealed and sub-surface structural features in the dolomite area at the Annamayya Dam site, Rajampet. The investigation includes executing surveys, followed by...
by BlueEnergy Build | Feb 18, 2026
The scope of work includes conducting a geophysical survey to identify suitable borehole locations for fresh groundwater development at the ANYPF project in Nimmaluru, Carrying out all survey activities in accordance with the technical specifications and contract...