Medha Servo Drives

The scope of work includes conducting a comprehensive hydro-geological and geophysical investigation over the designated 106-acre area by performing mag-netic, resistivity soundings, and detailed water-level and water-quality assessments. The study aims to evaluate subsurface conditions and identify groundwater potential, followed by preparation and submission of a detailed technical report summarizing all findings.

[ Related Projects ]

Explore Our Curated Projects

Energy Monitoring

Smart Energy Hub for TechPark

  • Austin, Texas

We implemented a hybrid solar + wind system with advanced battery storage, providing 24/7 reliable power for TechPark’s operations.
  • Power Rating

    12 KWP
  • ROI

    12 YEARS
  • Solar Panels

    16 Panels
  • Annual Savings

    $3,000
Wind Turbines Solution

Coastal Wind Farm Expansion

  • Atlantic Shore, North Carolina

We installed over 1,200 high-efficiency solar panels across residential rooftops, providing clean energy to more than 300 homes.

  • Power Rating

    12 KWP
  • ROI

    12 YEARS
  • Solar Panels

    16 Panels
  • Annual Savings

    $3,000